The Maugel Family Website

House Projects

Completed:

  • Hardwood floors refinished (Douglas Fir) sanded and protected
  • Reconnected the 220v outlet in the basement for the dryer
  • Installed a lift (pump) in the basement for the washer (This will allow us to install plumbing for a second bathroom in the future for when we finish the basement.)
  • Installed a motion-sensored flood light on the back porch.
  • Replaced all light bulbs with CFL energy-efficient bulbs. (except decorative lights)
  • Removed old air conditioning unit from dining room window.
  • Mowed the lawn
  • Raked the lawn to remove as much dead grass & weeds as possible.
  • Fertilized the lawn with Scotts TurfBuilder with WeedControl (we have lots of dandelions)
  • Dug an area for our garden.
  • Built a wood frame for our box garden.
  • Removed old drapes and hardware
  • Grounded all outlets, GFI in bathroom
  • Hooked up Washer / Dryer
  • Grounding all electrical outlets
  • Plant Garden
  • Overseed the lawn & water the lawn
  • Install 1″ wood blinds
  • Get the kitchen remodel started. (ongoing)
  • Install drains around downspouts to keep water away from house foundation
  • Pads on all furniture to protect the floors
  • Replaced toilet seat
  • Replaced toilet pump
  • Caulk windows in back, took out antenna in front, caulked hole.
  • Fixed bathroom window to open
  • Replaced all batteries in smoke detectors, tested.
  • Cable management in basement
  • Painted 3rd coat in green room
  • Insulated the water heater
  • Cut a piece of plexiglas for the dryer vent
  • Wire the house with Cat6 cable
  • Carpet back closet & laundry area downstairs
  • Install closet organizer in back closet
  • Painted master closet
  • Install ceiling fan & light in bedroom
  • ADT Security System installed.
  • Installed ceiling fan & light in living room
  • Installed dimmers for decorative lights in dining room & living room
  • Installed screens for windows without them.
  • Replace all plexiglas windows with glass.
  • Paint and fix exterior trim in back.
  • Clean, Oil, Stain any wood trim that needs it
  • Install wood door stops for doors that are missing them (have them)
  • Install Cat6 & coaxial jacks in all rooms
  • Paint bedroom & bathroom
  • New 6′ Cedar Fence
  • Point & Tuck Brick
  • Paint exterior of house
  • Built 10’x12′ Shed

To do:

[_] Install new light fixture in dining room

Future:

[_] Finish Basement
[_] Build Garage
[_] Landscaping (ongoing)

Energy & Environmental Design Efforts:
(http://www.eere.energy.gov/consumer/)

  • High-Efficiency Front Load Washer / Dryer
  • Energy-Efficient CFLs for every light (except decorative)
  • Installed window treatments (1″ wood blinds)
  • Using & adding storm windows
  • Irrigation system to efficiently water the lawn
  • Lighting controls (use of dimmers, motion sensors, photosensors, & timers)
  • Lower Water Heating Temperature for Energy Savings
  • Insulating Water Heater
  • Energy Star Qualified Appliances (Stove/Refrigerator/Dish Washer)
  • Updated attic-insulation from R-6 (3″ rock wool) to energy code IECC 2006 R-38 (add 10″ of cellulose insulation)
  • Installed High-efficiency (92%) Energy Star Qualified Furnace

To do: